Risk management
One of the most important issues in risk management is to estimate the seismic intensity of earthquakes, landslides and slope
failure hazards; caused by typhoons or torrential rain, and damage by floods in advance.
In the field of earthquake disaster management, the building damages and casualties for scenario earthquakes are calculated considering: ground conditions, building vulnerabilities, and scenario
earthquakes. We are contributing to improve the risk management capacity of our clients by collaborating with risk assessments and risk management planning.
For the disasters caused by landslides and slope failures, we support local authorities in establishing effective monitoring systems of hazardous slopes and advise them about safer, reliable, and
cost effective countermeasures. We also provide technical support to improve the accuracy of soil analysis, slope stability surveys, and risk assessments to our counterparts.
Project List
Country
|
Project Name | Type of Service | Project Duration |
Honduras | Assistance for Strengthening and Capacity Building of Professional techniques for the Control and Mitigation of Landslide in Tegucigalpa Metropolitan Area | Technical Cooperation | 2015-2016 |
Bangladesh | Data Collection Survey on Safety Enhancement of Buildings of Dhaka Metropolitan Area | Data Collection and Investigation | 2014-2015 |
Bhutan | Project for Master Plan Study on Road Slope Management | Master Planning | 2014-2016 |
Myanmar | The Project for Improvement of Road Technology in Disaster Affected Area | Technical Cooperation | 2014-2015 |
North and Latin America | Disaster Prevention Capacity-building Project in North and Latin America: Phase 2 - Detailed Planning Study II | Detailed Planning Study | 2014 |
Turkey | Capacity Development Toward Effective Disaster Risk Management | Technical Cooperation | 2013-2014 |
ASEAN | Data Collection Survey on Natural Disaster Risk Assessment and Regional Business Continuity Plan for Industrial Clusters in ASEAN Region | Data Collection and Investigation | 2013-2015 |
Mauritius | The Project for Capacity Development on Coastal Protection and Rehabilitation,the project for Landslide Management | Development Study with Technical Cooperation | 2012-2015 |
Iran | Project for Capacity Building for Earthquake Risk Reduction and Disaster Management on Tehran | Technical Cooperation | 2012-2015 |
Ethiopia | Capacity Development for Countermeasure Works of Landslide | Technical Cooperation | 2011-2016 |
Bangladesh | Preparatory Survey of the Cooperation to the Disaster Prevention Sector | Preparatory Study | 2011-2012 |
Bangladesh | Project for Capacity Development on Natural Disaster-Resistant Techniques of Construction and Retrofitting for Public Buildings | Technical Cooperation | 2010-2015 |
Turkey | School-based Disaster Education Project | Technical Cooperation | 2010-2014 |
Pacific Countries | Project on Strengthening Community Based Disaster Management in the Pacific Countries | Technical Cooperation | 2010-2013 |
Pakistan | Project for National Disaster Management Plan (Human Resource Development Plan on Disaster Management) | Development Study with Technical Cooperation | 2010-2012 |
Ethiopia | Technical Assistance on Design and Construction Management of Countermeasures for Landslide | Dispatch of Expert | 2010-2011 |
Worldwide | Study on Problems and Lessons in Overseas Assistance Project on Disaster Management | Project Study | 2010-2011 |
Philippine | Evacuation Shelter Construction Project in Mayon Volcano Disaster Areas | Basic Design | 2010-2011 |
Ethiopia | Preparatory Survey for the Project on Countermeasure Works for Landslide in Abay Gorge | Preparatory Study | 2010 |
Worldwide | Collection and Analysis of Information on Overseas Assistance in the Field of Disaster Management | Data Collection and Investigation | 2010 |
Bolivia | Project for Capacity Development of Road Disaster Prevention and Bridge Management and Maintenance | Technical Cooperation | 2009-2012 |
Indonesia | Urgent Project on Reconstruction of Schools Considering Quake-Resistance and Community Based Disaster Risk Management in the Providence of West Sumatra | Grant Project | 2009-2011 |
Worldwide | Development of a Simplified Risk Mapping Tool to Facilitate and Optimize Emergency Response to Major Floods (FRAT) | Technical Investigation | 2008-2009 |
Turkey | Production of Microzonation Report and Maps, Asian Side | Technical Investigation | 2008-2009 |
Bangladesh | Comprehensive Disaster Management Programme (CDMP) | Technical Investigation | 2007-2013 |
Iran | Project on the Establishment of Emergency Response Plan for the First 72 Hours after an Earthquake (Stage II) | Technical Cooperation | 2007-2010 |
Kazakhstan | Study on Earthquake Disaster Risk Management for Almaty City | Master Planning | 2007-2009 |
Myanmar | Follow up Project on Capacity Development for Earthquake Observation and Seismic Data Analysis | Dispatch of Expert | 2007-2008 |
Iran | Persian LNG Project ( FEED Phase) Seismic Hazard Analysis and Report | Technical Investigation | 2007 |
Turkey | Production of Microzonation Report and Maps, European Side | Technical Investigation | 2006-2008 |
India | Seismic Microzonation for Gandhidham; Kutch; Gujarat | Master Planning | 2006-2008 |
Colombia | Study on Monitoring and Early Warning System for Landslide and Floods in Selected Area in the Capital District of Bogota and Soacha Municipality | Master Planning | 2006-2008 |
Ethiopia | Geological Investigation on Landslides for Rehabilitation of Trunk Road Phase III | Technical Investigation | 2006-2008 |
Worldwide | Risk Integration in Poverty Assessment | Technical Investigation | 2006~2007 |
Iran | Project on the Establishment of Emergency Response Plan for the First 72 Hours after an Earthquake (Stage I) | Technical Cooperation | 2006 |
Philippine | Study on Risk Management for Sediment-related Disaster in Selected National Highways | Master Planning | 2006-2007 |
Bolivia | Study on Preventive Measures against Road Disasters on Main National Roads | Master Planning | 2005-2007 |
Algeria | Study of Seismic Microzoning of the Wilaya of Algiers | Master Planning | 2005-2007 |
Iran | Study on Water Supply System Resistant to Earthquakes in Tehran Municipality | Basic Design | 2005-2006 |
Costa Rica | Strengthening the Volcano Monitoring Capacity of Costa Rican Volcanic and Seismological Observatory | Dispatch of Expert | 2005 |
Iran | Study on Flood and Debris Flow in the Caspian Coastal Area Focusing on the Flood-hit Region in Golestan Province | Master Planning | 2004-2006 |
Philippine | Study on Program Formulation in Disaster Mitigation Sector | Project Study | 2004 |
Nicaragua | Study on Establishment of Base Maps and Hazard Maps for GIS | Master Planning | 2003-2006 |
India | Feasibility Study for Seismic Microzonation | Feasibility Study | 2003-2004 |
Venezuela | Study on Disaster Prevention Basic Plan in the Metro District of Caracas | Master Planning | 2002-2005 |
Iran | Study on Disaster Prevention/Mitigation Basic Plan in the Greater Tehran | Master Planning | 2002-2005 |
Philippine | Study on Earthquake Disaster Prevention in the Manila Metro Area | Master Planning | 2002-2004 |
Japan | Research Work : Disaster Management and Development | Research Work | 2002-2003 |
Colombia | Study on Disaster Prevention in Bogota Metro Area | Master Planning | 2001-2002 |
Turkey | Study on Disaster Prevention/Mitigation Basic Plan in Istanbul including Seismic Microzonation | Master Planning | 2001-2003 |
Nepal | Study on Earthquake Disaster Mitigation in the Kathmandu Valley | Master Planning | 2001-2002 |
Malaysia | Study on Slope Disaster Management for Federal Roads | Master Planning | 2000-2002 |
Iran | Study on Seismic Microzoning of Greater Tehran Area | Technical Investigation | 1999-2001 |
Worldwide | RADIUS: Risk Assessment Tool for Diagnosis of Urban Areas Against Seismic Disasters | Technical Investigation | 1998-2000 |